Your Bathroom Installation
Removal
- Removal of existing bathroom suite
- Isolation of all water services, including valves on all service pipework to sanitaryware
- Removal of all tiles including borders, window beading etc
- Removal of any plaster, plasterboard or lathe-plaster if affected by removal of tiling.
- Removal of all debris including broken tiles and the old bathroom suite from site
Fitting
Professional fitting by one of our experienced and friendly fitters. Your fitter will look after the whole job from start to finish. He will take great care not to make a mess of your house, we always dust-sheet from the entrance to your home through to all working areas.
Making Good
- All plastering, studding, plasterboard and skimming as needed.
- Tiling the wall and floor, new flooring or ply over sheeting to make good the floor if needed
- All the tiles will be grouted.
- Pipes will be boxed in where desirable (and possible!)
- The bath and sink edges will be sealed with silicone sealant.
- The whole room will be left clean and tidy.
The entire job from start to finish should take no more than 5 - 7 days